The general trades contractor has completed installation of the roof and siding panels, stone fa├žade, interior liner panels, overhead doors and windows.

The soffits, fascias and detail work continue to make progress. Inside the building, interior finish work also continues, with painting, ceiling grid and ceramic tile work all underway.

Work on the second stair tower installation has begun, along with the elevator installation work. The mechanical, electrical, and plumbing contractors are installing rough-in work on both the first and second levels.

Ductwork installation is also moving along throughout the facility. Fire sprinkler system is also nearly complete.