Work on the bus warmer continues with the electrical panel and outlets now going in. The building’s concrete block work is now complete, and the decorative stone façade work continues to take shape. Most of the building’s steel frame has been installed, with only the second portion of the mezzanine remaining. The steel detailing, exterior metal skin, and roof panel work are currently in progress, as is metal stud work. Inside, drywall is now being installed on interior walls as those spaces are available.